Английская версия
About
  • About
  • Our History
  • Business geography
  • Board of Directors
  • Management Team
  • Career
  • Certificates
  • Сompany details
Types of Activities
  • Front-End Engineering Design
  • Design and Engineering of Power Facilities
  • Start-Up and Performance Adjustment, Testing, Examinations, Audit
  • Smart Complete Engineering Procurement
Career
Press
Contacts
Ещё
    Ask a question
    +7 (383) 328-08-09
    Order a call
    office@ennova.energy
    Novosibirsk, st. Kropotkina, 96/1
    • Facebook
    • Instagram
    • YouTube
    Rus En
    Английская версия
    About
    • About
    • Our History
    • Business geography
    • Board of Directors
    • Management Team
    • Career
    • Certificates
    • Сompany details
    Types of Activities
    • Front-End Engineering Design
    • Design and Engineering of Power Facilities
    • Start-Up and Performance Adjustment, Testing, Examinations, Audit
    • Smart Complete Engineering Procurement
    Career
    Press
    Contacts
      Английская версия
      About
      • About
      • Our History
      • Business geography
      • Board of Directors
      • Management Team
      • Career
      • Certificates
      • Сompany details
      Types of Activities
      • Front-End Engineering Design
      • Design and Engineering of Power Facilities
      • Start-Up and Performance Adjustment, Testing, Examinations, Audit
      • Smart Complete Engineering Procurement
      Career
      Press
      Contacts
        Rus En
        Английская версия
        Rus En
        Английская версия
        • About
          • Назад
          • About
          • About
          • Our History
          • Business geography
          • Board of Directors
          • Management Team
          • Career
          • Certificates
          • Сompany details
        • Types of Activities
          • Назад
          • Types of Activities
          • Front-End Engineering Design
          • Design and Engineering of Power Facilities
          • Start-Up and Performance Adjustment, Testing, Examinations, Audit
          • Smart Complete Engineering Procurement
        • Career
        • Press
        • Contacts
        • +7 (383) 328-08-09
        office@ennova.energy
        Novosibirsk, st. Kropotkina, 96/1
        • Facebook
        • Instagram
        • YouTube
        • Main
        • Press
        • News
        • The first boiler ignition at power unit No.1 of the Primorskaya TPP was successfully performed

        The first boiler ignition at power unit No.1 of the Primorskaya TPP was successfully performed

        The first boiler ignition at power unit No.1 of the Primorskaya TPP was successfully performed
        3 March 2020
        News

        A trial run of the steam boiler was performed at the Primorskaya TPP. This is a key stage of commissioning of power unit No. 1 to put it into operation. This was reported by the press service of Inter RAO - Engineering.

        During the trial run, the ignition of the boiler firing fuel oil was fine-tuned, and the operability of main and auxiliary systems equipment, instrumentation, remote and automatic control devices, process protection devices, unit locks during start-up was checked. While performing the works, no internal defects of the system were detected, its operability was fully confirmed, which enables the specialists of Inter RAO - Engineering to proceed with steam blowdown of utility boiler superheaters and pipelines of power unit No.1.

        Currently, the whole package of works is being performed in the buildings and premises of the power plant: erection of boiler steel structures, installation of pumping station equipment, crusher, conveyors gallery. In the fuel storage a dust shield is being installed and bentonite (modern waterproofing material) mats are being laid. The construction of railways and on-site roads is in progress.

         The Primorskaya TPP for 195 MW consists of three steam power plants with a unit capacity of generating equipment of 65 MW. Each power unit includes a steam turbine manufactured by the Urals Turbine Plant (Ekaterinburg), a turbine generator (ELSIB, Novosibirsk) and a steam boiler E-240-13.8-560 KT (PK-114) (Machine Building Factory of Podolsk, Moscow Region).

        Coal will be the main fuel for the Primorskaya TPP. The construction of the plant will make it possible to diversify the fuel mix of the Kaliningrad energy system to reduce its energy production dependence on natural gas supplies. ThegeneralcontractorisInter RAO - Engineering.

        Нужна консультация?

        Наши специалисты ответят на любой интересующий вопрос

        Задать вопрос
        Поделиться
        Назад к списку
        © 2022 Copyrite.
        +7 (383) 328-08-09
        office@ennova.energy
        Novosibirsk, st. Kropotkina, 96/1
        • Facebook
        • Instagram
        • YouTube
        Privacy policy
        © 2022 Copyrite.
        54376381